CNOOC approves Stauper´s CFUs at Caofeidian Oil Field Development Project. The single stage CFUs package is a Greenfield installation and is removing over 90% of oil in water using no flocculants in the process. Oil in water into CFU is 500 ppm, outlet is stable at below 35 ppm.
